The estimates produced at the post architectural level are based on the same basic formula that is used in the early design estimates. However, the size estimate for the software should be more accurate by the stage in the estimation process, and 17 rather than seven attributes are used to refine the initial effort competition. The estimate off the daughter number off lines off source code is adjusted to take two important project factors into account their requirements for totality. An estimate Ismay off the reward, which may be required to accommodate changes to the system requirements. This estimate is expressed as the number off lines off saw score, which must be modified, and this number is added to the initial size, estimate the extent off possible reuse. Extensive reuse means that the number off lines off saw score, which will actually be developed, must be amended. However, Selby, 1988 discovered that reuse costs are nonlinear because off the initial effort required to discover and select components and because off the effort required to understand re usable components and the interface is if they need to be modified. The effects ofthe reviews are taken into account in Coke Mo, too, by adjusting the size ofthe according to the former formula