Subsea Training

0:00
Video Narration
425
4

Description

Training video for building a subsea oil rig.

Vocal Characteristics

Language

English

Voice Age

Middle Aged (35-54)

Accents

North American (General)

Transcript

Note: Transcripts are generated using speech recognition software and may contain errors.
In the sub sea completion production equipment such as the wellhead is installed on the sea floor instead of on the top sides of a platform. This has several important benefits. Summer economic relocating equipment to the sea floor reduces load on the platform so smaller, lighter and less costly floating structures can be used.