Instructional Video

0:00
Video Narration
30
0

Description

Training and Instruction

Vocal Characteristics

Language

English

Voice Age

Middle Aged (35-54)

Accents

North American (General) North American (US Midwest- Chicago, Great Lakes)

Transcript

Note: Transcripts are generated using speech recognition software and may contain errors.
to start the unit. The switch should be in the off position, plugged the remote cord into the control panel. The blower is powered by 2 12 gauge lit cords. Each court should be on a separate 15 AMP circuit. To activate the machine, pull out the emergency stop with a slight twisting motion. The yellow ready light will laid up. Push the start button and the green on light will turn on. This activates the machine and the remote control. Begin loading the hopper with insulation. The hoppers capacity is half a standard bag. At first, break up the insulation material into manageable six inch diameter pieces. For proper insulating density. Locate the slide gate control and set 1/2 open position and adjust is needed. The machine is now ready to start blowing insulation into the added switch. Remote toe Aaron material to begin, start from the furthest point and work towards the attic entrance.