Joel Haberli e-learning for ESL
Description
Vocal Characteristics
Language
EnglishVoice Age
Middle Aged (35-54)Accents
North American (General) North American (US General American - GenAM)Transcript
Note: Transcripts are generated using speech recognition software and may contain errors.
configuring tr. Let's take a look at how total responsibility is configured. Do you think the following statement applies when configuring the TR plan? The preventive maintenance schedule and the visit content should always be standard. Do they need to be standard, or should we adjust them when needed? Or are the extra items covered by the breakdown risk? Correct. Incorrect. Always double. Check the visit schedule and content and adjust them. If the site or the equipment conditions require it, make sure you're prepared. Here are four points You should always keep in mind. One. Always do a site and equipment health check before you configure your TR. Offer to anticipate any obstacles that might eventually get in the way of service and take additional needed time into account. Three. Reduce the risk by adding as many protective measures as possible potential upgrades or changes in the installation and four. Configure risk correctly in I Q Square. Let's now go over each of these items